7 September 2006
Location: Chisholm Institute, Berwick
Supervisor: Glen Morris (BCSE Accred. F1441)
Monitoring current, voltage and temperature of test cell

Reverse current was slowly increasesd in 240mA steps until cell began to fail.

Shannon logging the data from the test setup.

Test setup. Note the 2 x 500W spot lights behind. Used to see what the module's Isc and Voc were after damage.

Rear of cell under test. Note overheating of cell conductor (peaked at 18A).
Cell destruction testing was halted due to smoke from the feed in cables. Note bubbling on insulation.
Results of cell testing
| Time (H:m:s) | Single Cell Volts | Milliamps | Test Cell Temp | Ref Cell Temp | Notes |
| 02:37:00 | 0.0 | 0 | 18.7 | 18.7 | |
| 02:38:00 | 9.5 | 250 | 20.8 | 18.6 | |
| 02:40:00 | 14.3 | 500 | 30.0 | 18.5 | |
| 02:42:00 | 16.8 | 750 | 40.0 | 18.5 | |
| 02:43:00 | 16.9 | 1000 | 42.5 | 18.5 | |
| 02:46:00 | 19.4 | 1250 | 54.0 | 18.6 | Thin conductor on front of cell flashed |
| 02:50:00 | 5.7 | 1500 | 32.0 | 18.6 | |
| 02:50:00 | 7.2 | 2000 | 31.0 | 18.7 | |
| 02:51:00 | 7.6 | 2250 | 27.0 | 18.8 | |
| 02:52:00 | 8.0 | 2500 | 29.5 | 18.9 | |
| 02:53:00 | 5.4 | 3000 | 30.3 | 18.9 | |
| 02:54:00 | 5.7 | 4000 | 30.5 | 18.9 | |
| 02:55:00 | 5.1 | 5000 | 30.6 | 18.9 | |
| 02:56:00 | 4.6 | 6000 | 34.0 | 18.9 | |
| 02:57:00 | 3.9 | 7000 | 36.0 | 18.9 | |
| 02:58:00 | 3.8 | 8000 | 36.0 | 18.9 | |
| 02:59:00 | 3.0 | 9000 | 36.0 | 18.9 | |
| 03:00:00 | 3.7 | 10000 | 36.0 | 18.9 | Tested cell with spot lights after overheating and still produced 2.5A output under Isc |